How Abacus Builders Uses TrueLook Across Every Jobsite

Back to Hub
  • Case Studies

How Abacus Builders Uses TrueLook Across Every Jobsite

Abacus Builders uses TrueLook cameras for jobsite security, progress tracking, and client-ready time-lapse video.

Abacus Builders jobsite captured by a TrueLook construction camera

Key Takeaways

  • Abacus Builders, a general contracting and property development company in Boston, added TrueLook cameras for security, progress tracking, and time-lapse video across their jobsites.
  • After comparing several camera providers, TrueLook checked the most boxes and came out as the best value.
  • Owner Mark Little purchased four cameras and moves them between jobsites as projects wrap up and new ones begin.
  • All four core features (time-lapse, security recordings, live viewing, and TrueAI) have proven valuable, with the team rating the experience “10/10.”
  • Clients can view the cameras directly, since Abacus Builders embeds the live feeds on their website, giving stakeholders an easy way to watch progress remotely.
picture of abacus builder's jobsite

The Challenge

Mark Little, Owner of Abacus Builders, had been looking for a jobsite camera solution for years before landing on TrueLook. The hold-up wasn’t a lack of interest; it was that the technology hadn’t caught up to what an active construction site actually needs.

Before finding a system that worked, Little’s team was navigating a few distinct challenges at once:

  • Unreliable jobsite Wi-Fi; the biggest obstacle standing between the team and a working camera system, and something most products on the market weren’t built to handle.
  • Security coverage for sites that sit unattended outside of work hours.
  • Progress tracking he could check without driving to the site.
  • No system for long-term documentation — Mark Little wanted time-lapse video capturing each project from start to finish, not just security footage.

On top of all that, any solution needed to be portable. Abacus Builders runs multiple projects at different stages, and a camera system tied to one location wasn’t going to cut it.

picture of of one of Abacus builders job sites showcasing apartment complexes and houses

The Solution

Mark Little compared several jobsite camera companies apples to apples before choosing TrueLook. Across the board, TrueLook checked the most boxes, solving the Wi-Fi problem that had stalled him for years, while also delivering the best overall value compared to competitors.

Abacus Builders purchased four TrueLook cameras and has moved them between jobsites with ease as projects finish and new ones start. Day-to-day, the team relies on:

  • Live viewing, giving Abacus Builders eyes on any site at any time, from desktop or smartphone.
  • Security recordings, providing a documented layer of protection across every jobsite.
  • Time-lapse, capturing each project from start to finish and producing a polished video once the work wraps up.
  • TrueAI, adding another layer of automated insight on top of the footage.

We’d been searching for jobsite cameras for years, waiting for technology to catch up — Wi-Fi being the biggest obstacle. TrueLook ticked all the boxes and was the best value. We’ve moved our four cameras from site to site with ease, and our clients love being able to view progress themselves. 10/10 for these guys.

Mark Little, President/Owner, Abacus Builders

The Results

TrueLook has become a standard part of how Abacus Builders runs its jobsites, delivering on every front Abacus Builders set out to solve.

Screenshot of TrueLook construction cameras platform on the time-lapse page, showing all of the progress documented

1. A Camera System That Actually Works on a Jobsite

By solving the Wi-Fi problem that had held Abacus Builders back for years, TrueLook gave Abacus Builders a system built for real jobsite conditions, not just ideal ones.

2. Portable Coverage Across Projects

The four cameras move from site to site as projects finish and new ones begin, giving Abacus Builders consistent coverage without buying new equipment for every job.

3. Responsive Support When It Matters

Mark Little singled out TrueLook’s support team for responding to every question and need immediately; a detail that stood out enough to make it into his own words about the experience.

4. Stronger Client Relationships Through Transparency

Embedding the camera feeds on the Abacus Builders website gives clients direct access to progress, building trust and cutting down on status-update requests.

5. A Finished Product Clients Remember

The time-lapse video TrueLook generates at project completion gives Abacus Builders a polished deliverable that documents the full build; useful for clients, marketing, and portfolio building alike.

Get the Coverage Abacus Builders Trusts on Every Job

Portable, jobsite-ready cameras with live viewing, security, time-lapse, and TrueAI in one system. Get a custom quote today.

How Mitchell Design Build Combines Jobsite Security with Real-Time Project Oversight

Back to Hub
  • Case Studies

How Mitchell Design Build Combines Jobsite Security with Real-Time Project Oversight

A fixed-position camera gives Mitchell Design Build (MDB) live jobsite visibility and a documented security layer in one system.

Mitchell Design Build jobsite captured by a TrueLook construction camera

Key Takeaways

  • MDB added a TrueLook fixed-position camera to the Bright Flite Facility at Maguire Family Properties’ property to give project managers a live look at the jobsite without needing to be on-site.
  • The camera doubles as a security layer, giving the team the ability to pull recorded footage if a breach occurs — turning what used to be a blind spot into documented evidence.
  • Security capabilities and time-lapse were the deciding factors in choosing TrueLook over other options. Live viewing, time-lapse, and security recordings are all in regular use; the team hasn’t yet explored TrueAI, leaving room to add AI-powered monitoring as the relationship grows.

The Challenge

For the project management team, the project came with a familiar set of jobsite management problems: how do you keep tabs on progress without living on-site, and how do you protect a site that’s unattended for most of the day?

Mitchell design build maguire bright flite construction site captured by a TrueLook construction camera providing them with jobsite visibility

Before bringing in a camera, the team was working with a few gaps:

  • No remote visibility into daily progress — project managers needed a way to check conditions on the site without driving out or waiting for a status update from the field.
  • Limited security oversight after hours — an unmonitored site is an easy target, and without documentation, there was no way to act on an incident after the fact.
  • No evidence trail if something went wrong — if a breach happened, the team had no recordings to fall back on for insurance, investigation, or accountability.

MDB needed a system that could close all three gaps at once, not a piecemeal solution stitched together from separate tools.

Mitchell Design Build Maguire Bright Flite construction site

The Solution

MDB deployed a TrueLook fixed-position camera on the Maguire Family Properties and Bright Flite jobsite, using a 4K fixed IR camera to keep the site covered around the clock — not just during daylight hours when most activity happens.

Two things drove the decision to go with TrueLook specifically: its security capabilities and its time-lapse functionality. For the project management team, those two features solved the core problem (visibility paired with protection) without adding complexity to the day-to-day workflow.

Since installation, the team has leaned on:

  • Live viewing to give project managers a real-time look at the site whenever they need it, no site visit required.
  • Security recordings to document the jobsite continuously, with the ability to go back and review footage if a breach occurs.
  • Time-lapse to capture the overall progress of the project as it moves through each phase.

TrueAI hasn’t been part of the workflow yet; the team has focused on the core visibility and security features first, with room to explore AI-powered monitoring as the deployment matures.

The Results

On the Maguire Family Properties and Bright Flite Project, TrueLook is delivering on the three problems the team set out to solve.

Screenshot of TrueLook construction cameras platform on the time-lapse page, showing all of the progress documented

1. Remote Visibility Without a Site Visit

Project managers can check in on the jobsite in real time through live viewing, cutting down on unnecessary trips and giving the team a faster read on where things stand.

2. A Documented Security Layer

The camera isn’t just a deterrent; it gives MDB recorded footage they can pull if a breach happens, turning an unmonitored site into one with a built-in evidence trail.

3. A Running Record of Progress

Time-lapse is capturing the full arc of the Maguire Family Properties and Bright Flite build, giving the team a visual record of the project from start to finish.

4. A Marketing Asset That Builds Excitement

MDB shares the time-lapse footage on social media, giving stakeholders a way to watch the project take shape in real time and generating excitement around the build well before it’s finished.

5. A Consistent Approach Across Projects

Having used fixed-position cameras on completed projects before Maguire Family Properties and Bright Flite project, MDB has a proven, repeatable system and an open path to bring TrueAI into the mix as the team looks to expand coverage further.

Protect and Showcase Your Next Build Like MDB

Give your team a real-time look at every jobsite, day or night.

How Jarbou Ronnisch Construction Group Balances Client Transparency, Security, and Storytelling

Back to Hub
  • Case Studies

How Jarbou Ronnisch Construction Group Balances Client Transparency, Security, and Storytelling

Fixed-position cameras serve as client oversight, jobsite security, and long-term marketing at once.

Camera view of a commercial building under construction with a crane

Key Takeaways

  • Jarbou Ronnisch Construction Group (JRC) runs TrueLook fixed-position cameras across two active projects, with the specific use case shifting depending on what each client and project needs most.
  • On the Whole Foods project, a vandalism incident reinforced what JRC already believed: camera coverage works best as one layer of a complete security strategy.
  • At Hunter’s Square, a large, multi-year redevelopment at one of the area’s busiest intersections, the camera is capturing the full transformation from start to finish, building a visual record JRC expects to use as a marketing asset once the project wraps.
  • TrueLook’s combination of live viewing, archived images, and time-lapse in one platform gives JRC’s clients transparency into construction progress without needing to be on site.

The Challenge

For Kim Pollack, JRC’s Marketing and Communications Manager, and the rest of the team, no two projects call for a camera for the same reason; which meant JRC needed a system flexible enough to serve more than one purpose at once.

Hunters Square construction site

Before standardizing on TrueLook across active projects, JRC’s team was navigating a few distinct challenges at once:

  • Client-driven visibility requests — on the Whole Foods project, the client asked directly for a way to check on progress remotely without needing to be on site.
  • Jobsite security gaps — incidents can happen on any jobsite, reinforcing camera coverage as a critical layer of a broader security strategy.
  • No system for long-term documentation — at Hunter’s Square, a large, multi-year redevelopment at one of the area’s busiest intersections, JRC had no reliable way to capture the full transformation from groundbreaking to completion without relying on manual site visits or one-off photography.

There are different projects, different stakeholders, and different stakes, but the same underlying need for a tool that could flex to fit.

Whole Foods Ronnisch Construction site

The Solution

JRC now runs TrueLook fixed-position cameras across two active projects, matching the tool to what each project actually needs. Day-to-day, the team relies on:

  • Live viewing for a quick, no-site-visit read on jobsite conditions.
  • Time-lapse to build a continuous visual record on signature projects like Hunter’s Square.
  • Security recordings to add a layer of documentation and oversight across every jobsite, independent of whether an incident occurs.

What drew JRC to TrueLook in the first place was the combination of ease of use, image quality, and a feature set that delivers value at every stage of a project; not just at the end. For a construction management firm working alongside both internal project teams and outside clients, that combination mattered: it gave JRC’s own staff a faster way to check site conditions, and it gave clients another layer of transparency into progress without needing to be physically present.

On the Whole Foods project, the camera functions primarily as a security and remote-monitoring tool for a client who wanted consistent visibility into the build.

At Hunter’s Square, the same fixed-position camera setup is being used to build a continuous visual record of a multi-year redevelopment; footage JRC expects to lean on as a marketing asset once construction wraps.

TrueLook checked all the boxes: easy to use, good image quality, and gives clients another level of transparency, providing value throughout the life of a project.

Kim Pollack, Marketing & Communications Manager, Jarbou Ronnisch Construction

The Results

The impact has played out differently project to project, but the throughline is consistent: TrueLook gives JRC’s project teams and clients a reliable way to see what’s happening on site, without adding work for the people managing the build.

Screenshot of Ronnisch TrueLook job site where you can see the TrueLook images, day by day progress

1. Client-Facing Transparency, On Demand

On the Whole Foods project, the client gets remote visibility into progress whenever they want it, without needing to coordinate a site visit or wait on an update from the field team.

2. A Security Layer — Not a Standalone Safeguard

A vandalism incident reinforced an important lesson for JRC’s team: camera coverage is a critical layer of jobsite security, working alongside other measures to create a complete strategy.

3. A Growing Marketing Asset

At Hunter’s Square, time-lapse footage is quietly building toward a compelling before-and-after story of a multi-year redevelopment at one of the area’s busiest intersections; an asset JRC expects to put to use once the ribbon is cut.

4. No Added Work for the Field Team

Pollack noted that no single feature outweighs the others for JRC’s team. Live viewing, time-lapse, and security recordings each carry their own weight, and none of them require extra effort from project staff to maintain.

By matching TrueLook’s fixed-position cameras to what each project actually needs, JRC has built a system that:

  • Gives clients transparency into progress without requiring site visits
  • Reinforces jobsite security as part of a broader strategy, not a standalone fix
  • Builds long-term marketing assets on signature projects
  • Requires no added effort from the teams managing the build

Protect and Showcase Your Next Build Like Jarbou Ronnisch

Fixed-position cameras with live viewing, security recordings, and time-lapse — giving your team and clients visibility into every project from a single platform. Get a custom quote for your next jobsite.

How Terawatt Infrastructure Keeps 10 Fleet Charging Sites Secure and Visible from Across the Country

Back to Hub
  • Case Studies

How Terawatt Infrastructure Keeps 10 Fleet Charging Sites Secure and Visible from Across the Country

Remote oversight and PTZ control help a distributed project team manage construction on mission-critical rideshare charging infrastructure.

Row of EV fast chargers at a Terawatt Infrastructure fleet charging site

Key Takeaways

  • Terawatt Infrastructure runs charging depots for autonomous and rideshare fleets, where uptime and jobsite security are non-negotiable — these sites power vehicles that customers are actively relying on.
  • With projects spread across California, Florida, Texas, and DC, and a construction team based out of Los Angeles reporting to HQ in San Francisco, remote visibility replaced the need to be everywhere at once.
  • TrueShield and TrueDeter PTZ units with built-in strobes and sirens give Terawatt active deterrence, not just recorded footage, at sites where charging equipment and materials are a theft target.
  • Live viewing with remote pan-tilt-zoom control has become the team’s most-used feature — more valuable day-to-day than time-lapse, since cameras often have to be relocated as construction activity moves across the site.
  • TrueLook cameras are now standard across 10 Terawatt Infrastructure projects nationwide.

The Challenge: Overseeing Fleet Charging Construction from Coast to Coast

Terawatt Infrastructure builds charging depots positioned in the heart of rideshare demand. These sites are designed to deliver power for autonomous and rideshare fleets exactly where and when it’s needed. That mission comes with a high bar: the company has to deliver best-in-class charger uptime and act as a true infrastructure partner to fleet operators who depend on that power to keep vehicles moving.

Delivering on that promise gets harder when the projects building that infrastructure are scattered across the country. Terawatt’s headquarters is in San Francisco, but Sr. Construction Project Manager Rna Waheb runs point on projects from Los Angeles. With active builds in California, Florida, Texas, and Washington, DC, checking in on any single site in person meant a flight, not a drive.

Security was just as pressing: active construction sites housing electrical and charging equipment are an obvious draw for theft, and an unsecured site puts both the timeline and the eventual charger uptime commitment at risk.

Terawatt infrastructure team working on building an EV Fleet charging station in California

The Solution: TrueShield and TrueDeter PTZ Cameras with Active Deterrence

Terawatt now runs TrueLook’s TrueShield and TrueDeter PTZ units across its jobsites, chosen in large part for their built-in strobes and sirens, giving the team active, on-site deterrence rather than passive recording alone. That deterrence matters on sites where charging infrastructure and materials sit exposed during construction, long before a fence line or permanent security system is in place.

The bigger shift, though, has been in how the team works day to day. Live viewing with remote PTZ control has become the feature Terawatt relies on most. Because construction activity moves fast and cameras frequently need to be repositioned to keep the right angle on active work, the ability to pan, tilt, and zoom remotely, without dispatching someone to physically move a camera, keeps the team’s eyes on the right part of the site at the right time.

Time-lapsing is also valuable to the team in each project.

The ability to keep tabs on all projects across the country is invaluable.

Rna Waheb, Sr. Construction Project Manager, Terawatt Infrastructure

The Results: 10 Projects, One Consistent View

TrueLook cameras are now deployed across 10 Terawatt Infrastructure (6 active, 4 completed) projects, giving a Los Angeles-based project management team real-time visibility into sites from California to DC without boarding a plane.

Terawatt Infrastructure's active project dashboard in the TrueLook platform

Security strobes and sirens through TrueShield and TrueDeter give each site active protection during the construction phase, when charging equipment is most exposed. And remote PTZ control lets the team adapt camera coverage as fast as the jobsite itself changes.

For a company building infrastructure that fleet operators depend on for uptime, that combination of national oversight and site-level security has become part of how Terawatt gets projects built, and built on schedule.

Summary

Building charging infrastructure for autonomous and rideshare fleets means delivering mission-critical uptime from day one, and that starts on the construction site.

Terawatt Infrastructure needed a way to keep eyes on 10 projects spread across four states from a single point of oversight in Los Angeles, without sacrificing security on sites where equipment sits exposed during the build. With TrueShield and TrueDeter PTZ cameras, active deterrence, and remote live control that moves as fast as the jobsite does, Terawatt has built a repeatable model for overseeing distributed, high-stakes infrastructure projects.

See how TrueLook’s Auto & Fleet Facilities solutions can support your next charging infrastructure build.

FAQs About Construction Cameras for EV and Fleet Charging Sites

Fleet charging and EV infrastructure sites are secured with cameras that combine active deterrence, such as strobes and sirens, with live remote viewing, so the system doesn’t just record an incident but works to prevent one. TrueShield and TrueDeter units add that active layer on top of standard security recording, which matters most before permanent fencing or site security is in place.

Protect Your Next Infrastructure Build Like Terawatt

TrueShield and TrueDeter PTZ cameras with active strobes and sirens, remote live viewing, and nationwide project oversight from a single dashboard. Get a custom quote for your charging or fleet infrastructure project.

How to Streamline Jobsite Visibility with Software Integrations

Back to Hub
  • Case Studies

How to Streamline Jobsite Visibility with Software Integrations

Improved construction documentation, reduced site visits, and real-time visibility with connected jobsite technology.

TrueLook logo and Raken logo together

Customer Details

Teinert Construction

Customer

Raken + TrueLook

Integration Used

Texas

Located in

5 out of 5

Integration Ease of Use

The Challenge

For Project Executive, JD Coffee, and the team at Teinert Construction, managing multiple jobsites spread across far distances created constant friction.

Before implementing a connected workflow, the biggest pain points included:

  • Time lost to travel — team members were driving to jobsites far away just to “check in” on progress.
  • Limited visibility for stakeholders — sharing milestones with owners and partners was difficult without consistent visuals.
  • Documentation challenges — progress tracking relied on manual processes, making it harder to verify work or maintain alignment between field and office teams.

The physical distance between projects compounded these issues, making real-time awareness nearly impossible without significant effort.

The Solution

Teinert adopted an integrated approach using TrueLook cameras alongside Raken field reporting software. Day to day, the team uses:

Implementation was straightforward for the team, and the combined system quickly became what JD described as a “one-stop shop” for project visibility.

An infographic of a quote from JD Coffee, project executive saying that the integration became a one-stop shop because they lost time and money before it.
Contact us for a quote

The Results

The impact was immediate and measurable across several areas:

1. Significant Time Savings

Field teams are saving approximately 30 minutes per day on reporting and documentation alone, not including reduced travel time from fewer site visits. This time reduction is also due to everything being in one spot, with only one login.

2. Improved Project Confidence for Clients

Having 24/7 visual access created reassurance for both the project team and stakeholders.

Screenshot of the Raken and TrueLook integration where you can see the raken tabs on the left and the TrueLook live feed in the center

JD mentioned, “It’s been a relief on progress for the client and us.”

3. Better Decision-Making Through Data Quality

Consistent daily reports combined with visual confirmation improved real-time awareness of project health.

Screenshot of the Raken and TrueLook integration where you can see the raken tabs on the left and the TrueLook weather feed in the center

JD noted that decision-making has greatly improved, and seeing logs and visuals together provides a much clearer picture.

4. Dispute Resolution and Risk Reduction

The cameras provide objective evidence during things such as contractor disagreements.

For example, JD mentioned, “A spoils pile was shown to belong to a contractor that was denying it was theirs.”

By combining continuous visual documentation with structured daily reporting, Teinert:

  • Reduced unnecessary travel
  • Improved stakeholder transparency
  • Minimized login fatigue
  • Streamlined management for projects located far apart

Are you ready to cut travel, save time, and stay on top of every project with ease? Get a quote or reach out to learn how TrueLook + Raken gives you full visibility today.

Get a quote

How Leasing a Construction Camera Gave the University of Idaho Real-Time Insight Into a Major Build

Back to Hub
  • Case Studies

How Leasing a Construction Camera Gave the University of Idaho Real-Time Insight Into a Major Build

A flexible, plug-and-play approach to jobsite visibility, documentation, and stakeholder engagement

Camera view of the University of Idaho meat science building under construction

Customer Details

University of Idaho

Customer

1

Cameras Leased

Fixed 4K IR

Type of Camera

Moscow, ID

Project Location

The Challenge

The University of Idaho’s existing meat science laboratory, home to Vandal Brand Meats, had not been updated in decades. This USDA-inspected facility serves as the heart of the meat science program, supporting teaching, research, and community outreach.

With growing student enrollment and advancing industry standards, the university recognized the urgent need for a modern facility that could:

  • Accommodate larger classrooms and advanced processing technology
  • Support hands-on, experiential learning in meat harvesting, processing, packaging, and storage
  • Facilitate cutting-edge research in meat science
  • Maintain separate USDA-compliant spaces for fresh and packaged foods
  • Ensure modern safety standards and humane animal treatment
  • Improve accessibility and visibility on campus
  • Expand Vandal Brand Meats retail sales and community education

These goals led to the development of the Meat Science and Innovation Center Honoring Ron Richard, a major capital project. Given the scale and visibility of the investment, transparency and communication would be critical throughout construction.

However, major capital improvements are infrequent, and project budgets are typically structured for one-time use, especially when a specific college or department funds the work. Also, purchasing equipment that would have limited use after project completion was not a practical option.

The team needed a flexible, easy-to-deploy solution that delivered immediate value throughout construction without the long-term commitment of owning hardware.

University of Idaho Meat Science and Innovation Center under construction covered in Tyvek Housewrap and materials and a job trailer sitting out captured by a construction camera

The TrueLook Solution

To meet those needs, the University of Idaho Agriculture and Engineering team chose to lease a TrueLook 4K IR Fixed Construction Camera. Leasing a jobsite camera allowed the team to gain full visibility for the duration of the project without purchasing hardware that would see limited use after completion.

For Daryle, leasing aligned with how the university funds and manages major projects. Futhermore, it provided a clear cost structure, fit neatly into the project budget, and avoided the challenges of storing, maintaining, or redeploying equipment later.

Contact us for a leasing quote

The University of Idaho team selected TrueLook based on past experience and strong recommendations from fellow project managers. The team also had confidence in the platform and knew it would deliver reliable results on a high-profile build.

Once the camera arrived on site, installation was quick and straightforward.

Quote graphic stating "I could not have asked for a better experience getting the camera set up from delivery to installation. The instructions were clear. It was up and running within 5 minutes of powering it up. It was the epitome of plug and play." Aaron Rice - Construction Inspector

The Results

Throughout construction, the leased TrueLook 4K IR Fixed Camera delivered continuous visibility into the jobsite. Live viewing allowed stakeholders to check progress at any time. Security recordings helped protect materials and equipment during off-hours.

Aaron found the time-lapse and security features especially valuable, capturing the entire build while adding an extra layer of oversight.

For Daryle and the project management team, the ability to share a live link with contractors, designers, and stakeholders was a major advantage. Different groups used the camera in different ways, from monitoring milestones to answering questions without requiring site visits.

The final time-lapse became one of the most valuable outcomes. It provided a clear visual story to share with the campus community and served as a historical record of the project. It also offered a practical reference point for future questions about infrastructure placement and construction sequencing.

The final time-lapse will be a fantastic way to showcase this milestone to the entire campus community and serve as a historical document.

Daryle Faircloth, Architectural Project Manager, University of Idaho

Completed in early 2026, the Meat Science and Innovation Center now stands as a modern facility that supports education, research, safety, and community engagement. It allows the University of Idaho to better serve students and stakeholders while reinforcing its reputation as a leader in meat science.

Leasing a construction camera played a key role in that success. The approach delivered full visibility, strong documentation, and fast deployment without the burden of ownership.

By choosing to rent, the University of Idaho gained a powerful construction visibility tool that matched the scale and frequency of its capital projects.

The result was better communication, stronger documentation, and a smoother experience for everyone involved from project start through completion.

Once construction wrapped, the leasing model continued to pay off. With no long-term ownership responsibilities, the University of Idaho team returned the camera just as easily as it was installed. There was no need to store, maintain, or repurpose equipment after project completion, keeping the focus on the finished facility rather than post-project logistics.

For a one-time capital project, leasing provided a true end-to-end solution—from fast setup to a simple return—making it easy for the team to gain full visibility during construction and move on once the job was done.

Book a demo

How TrueLook Cameras Improved Project Visibility for The National Center of Civil and Human Rights Expansion

Back to Hub
  • Case Studies

How TrueLook Cameras Improved Project Visibility for The National Center of Civil and Human Rights Expansion

Transforming building progress into shared experiences

Completed National Center for Civil and Human Rights expansion at dusk

Customer Details

Juneau Construction Company

Customer

2

Cameras Purchased

Fixed 4K IR

Type of Cameras

Atlanta, GA

Project Location

The Challenge

The National Center for Civil and Human Rights in Atlanta recently undertook a transformative two-wing, 28,733-square-foot expansion designed to deepen visitor engagement and expand its role as a cultural and community hub. The project introduced an immersive Family Gallery for children, a hands-on Activation Lab, a gallery dedicated to the Reconstruction Era, refreshed permanent exhibits on civil and human rights, a redesigned gallery of Dr. Martin Luther King Jr.’s papers and artifacts, flexible classrooms and event spaces, and a welcoming café for reflection and conversation.

With so many new spaces and experiences, The Center faced the challenge of keeping donors, staff, board members, and the Atlanta community engaged and excited throughout construction. Traditional updates alone were insufficient for a project of this scale.

It’s tough to keep stakeholders updated with just written reports.

Donald Byrd, COO, National Center for Civil & Human Rights

At the same time, the Center and the GC, Juneau Construction Company, wanted to maintain project visibility for internal teams without requiring constant on-site visits. They also sought a way to leverage the construction process for marketing, storytelling, and community engagement, ensuring that the expansion would feel transparent, exciting, and connected from start to finish.

National Center for Civil and Human Rights' East or West wing under construction. Photo is taken by a construction camera.

The TrueLook Solution

Juneau Construction Company purchased and installed two TrueLook Fixed 4K IR construction cameras, one on the East Wing and one on the West Wing. These high-resolution, infrared cameras provided a suite of features designed specifically for large-scale construction projects such as this one:

  • Remote live viewing – 24/7 views of the jobsite with the ability to embed this feed onto a website
  • Time-lapse capabilities – Capturing images up to every 60 seconds and compressing weeks of progress into concise videos
  • High-resolution photography – Detailed images in 4K resolution for documentation or marketing
  • Weather-resistant, durable design – Ability to operate in hot Atlanta summers and other extreme conditions
  • Security recordings – Allowing the team to focus on the work and not worry about things like theft

The cameras provided by TrueLook allowed us to get a lot of visibility into the actual construction of the building, and it really amplified the storytelling of the building and the wings coming together.

Kelsey Restrepo, VP of Marketing and Communications, Juneau Construction Company

By combining advanced imaging capabilities with durable design and real-time streaming, these TrueLook cameras provided a reliable, comprehensive monitoring solution that captured the full scope of the National Center’s expansion from every angle.

The Results

The TrueLook cameras quickly became a cornerstone of project visibility and stakeholder engagement. The Center embedded the live feed directly onto their homepage, which allowed donors, staff, board members, and the Atlanta community to follow the expansion in real time. This interactive access transformed the construction process into a shared, engaging experience, providing transparency and excitement throughout the project.

Donald Byrd, COO of The Center, reflected on the live feed’s impact: “We sent it to everybody, all the donors. It was the most-watched part of our site when we had it up.”

In addition to the live feed, the cameras captured time-lapses and high-resolution photos that served as a valuable resource for storytelling. Both The Center and Juneau Construction leveraged these visuals across social media, including LinkedIn and Instagram Reels, creating dynamic content that highlighted key milestones and gave the community a compelling look at the transformation.

Kelsey Restrepo, VP of Marketing and Communications at Juneau Construction, noted, “The TrueLook cameras really help support our social media strategy and our marketing strategy. We are able to use both the time lapses and the images. We were able to use it on LinkedIn to turn videos into stories. We were able to share through Instagram reels. It told the story not only to our clients, our architect partners, and our trade partners, but it also told the story to people who we are recruiting into Juneau.”

The cameras also offered significant practical benefits for project management. Both teams were able to monitor daily progress remotely, reducing the need for frequent on-site visits while maintaining full oversight. This remote capability helped ensure that timelines were met, issues were identified quickly, and the project remained on track without sacrificing efficiency or communication.

By combining live community engagement, marketing-ready visuals, and remote project management, TrueLook cameras played a vital role in the success of the National Center for Civil and Human Rights expansion. They allowed construction teams and leadership to stay connected while transforming the expansion into a story celebrated by donors, staff, and the Atlanta community alike.

Customer quote: We were able to keep updated on it ourselves from our office space without coming out to the site, and it helped us manage the project much better

Want to see TrueLook cameras in action or explore how they can give your project unmatched visibility? Request a quote today or visit the National Center for Civil and Human Rights to experience the expansion in person.

How HGC Construction Found the Perfect Fit with 2K IR Fixed Cameras

Back to Hub
  • Case Studies

How HGC Construction Found the Perfect Fit with 2K IR Fixed Cameras

Two cameras made a huge difference for the team.

Camera on a light pole beside a building

Customer Details

HGC Construction

Customer

2

Cameras Purchased

School in Cincinnati

First Project Cameras Were Used On

Time-Lapsing

Favorite Feature

The Challenge

When HGC Construction began evaluating technology to support its projects, the team had a clear set of requirements. They needed cameras that could reliably capture high-quality visuals for time-lapse videos, provide the site team with live monitoring capabilities, and offer security coverage without driving up project costs. Many construction camera systems on the market were powerful but came with a price tag that was hard to justify for every project.

HGC was also thinking long-term. With several projects running simultaneously and more on the horizon, they wanted a scalable solution they could replicate across multiple sites without breaking their budget. The cameras needed to be easy to deploy, cost-effective, and versatile enough to handle time-lapse, live feed, and jobsite visibility in one package.

HGC Construction's two 2K IR Fixed TrueLook Cameras in three different photos.

The Solution

After exploring their options, HGC Construction selected TrueLook’s 2K IR Fixed Cameras, an affordable yet powerful solution that checked every box. They purchased two units, along with solar packages and pole mounts, which allowed the cameras to be set up quickly and run independently without the need for permanent power infrastructure.

Unlike higher-cost systems, the 2K IR Fixed Cameras gave HGC exactly what they needed: clear visuals for progress documentation, built-in security features, and a reliable live feed for jobsite monitoring, without unnecessary extras that would inflate the budget.

From Day 1, the TrueLook team has been fantastic to work with. We bought 2 of the 2K IR Fixed Cameras with the solar package and a pole mount, to be used for time-lapse purposes and the quality has been fantastic. They also offer security services and a live feed which has been an added value for the site team.

Daniel Bonacci, Project Manager, HGC Construction

The Results

The results quickly validated HGC’s decision. The cameras proved to be the perfect middle ground: affordable enough to scale across multiple projects, but powerful enough to deliver the quality and functionality the team needed. The time-lapse footage has become a compelling way to communicate progress with clients, while the live feed has given project managers and contractors a real-time view of work happening on site.

“This not only is great for sharing with the client but it gives a way to go back and review progress with contractors and see the project from an ariel view.” – Daniel Bonacci, Project Manager

By choosing TrueLook’s 2K IR Fixed Cameras, HGC not only saved money but also equipped their team with a tool that adds daily value to their workflow.

The cameras have performed so well that HGC now plans to carry them forward to multiple future projects. As the team put it: “We have been super happy with this product and look forward to carrying it on to our next project.”

With the right balance of affordability and performance, the 2K IR Fixed Cameras have become a trusted part of HGC’s construction toolkit.

Looking for the perfect fit for your next project?

We’ll help you find a camera that meets your needs and your budget.

Reach out to us

How Dimension Construction Uses TrueLook to Build Client Trust

Back to Hub
  • Case Studies

How Dimension Construction Uses TrueLook to Build Client Trust

To provide their customers with total transparency, Dimension Construction is now using cameras on its quick-serve projects.

Camera view of a completed Zaxby's restaurant building

Customer Details

Dimension Construction

Customer

6

Cameras Purchased

Memphis, TN

Headquarters

Procore Integration

Favorite Feature

90 + Days

from ground break to grand opening

One

simple login using TrueLook and Procore

In commercial construction, winning the contract is only the beginning. The real test comes in delivering the work safely, on time, and within budget, while giving clients confidence that their investment is in good hands.

For Dimension Construction, Inc., a Memphis-based general contractor specializing in restaurant and light commercial builds, that commitment to transparency has been the cornerstone of its reputation since opening its doors in 1993.

But in an era where project owners expect real-time access to progress and immediate answers to questions, traditional updates weren’t enough. Sending a few site photos at the end of the week could only provide a partial story. Dimension Construction wanted something more immediate, more complete, and more collaborative.

The Challenge

Dimension Construction’s portfolio includes fast-track projects for brands like Zaxby’s, where schedules often run just 90–120 days from groundbreaking to grand opening. The pace leaves little room for misunderstandings. Project managers needed a way to keep owners in the loop without adding more administrative burden to already tight schedules.

Static photography had long been the standard. It’s helpful for documenting milestones, but limited to isolated moments in time. Clients still had questions between updates, and answering them often meant phone calls, emails, or site visits that pulled superintendents away from critical work.

Our goal wasn’t just to show clients what we wanted them to see, we wanted them to have the ability to see exactly what was happening, when it was happening.

Jackson Wofford, Project Manager, Dimension Construction

The Solution: Always-On Jobsite Visibility

Dimension Construction adopted TrueLook’s 2K Fixed Camera and platform solution—a rugged, construction-grade system offering live streaming, high-resolution time-lapse, and 24/7 security recording. The camera’s 2K infrared (IR) resolution, 4–6 mm focal length, 79° horizontal field of view, and 50-meter IR range ensured clear, detailed imagery in all lighting conditions, day or night.

Available for lease, the hardware was designed for the demands of active jobsites and integrated seamlessly with the TrueLook platform.

TrueLook 2K IR Fixed Position Camera cutout showing an affordable option that customers often choose for jobsite visibility
A screenshot of the TrueLook platform that shows all of Dimension Construction's active projects

Installed on each active site, the cameras provided clients with a secure, continuous window into their projects:

  • Live Video Feeds: Owners could log in anytime to view progress in real time and spot potential issues as they happened, with IR capability enabling visibility in low-light or overnight conditions.
  • Automated Time-Lapse: Condensed visual records showed the entire build from start to finish, ideal for both progress tracking and marketing.
  • Recorded Video Playback: Footage provided indisputable documentation for schedule changes, delivery delays, or disputes, while also serving as a security layer to deter theft, monitor after-hours activity, and verify site access.
Zaxby's in TN under construction captured by a jobsite camera for visibility

One of the biggest advantages came from TrueLook’s integration with Procore, the project management platform already used by Dimension Construction. Clients could view live feeds directly within their existing dashboards—no extra logins, no extra training.

“It’s more than convenience. It’s about building trust. When a client can see the jobsite without waiting for us to tell them what’s going on, it changes the relationship.”

Jackson Wofford, Project Manager, Dimension Construction


TrueLook CEO Roger Yarrow agrees, adding: “Construction is built on relationships, and relationships are built on trust. When we give contractors and owners the ability to see the job from anywhere, at any time, we’re removing uncertainty. That changes the conversation from ‘What’s going on?’ to ‘How can we work together to solve this?’

The Impact: Transparency That Protects Relationships

In fast-track construction, delays are inevitable. Weather events, late deliveries, or subcontractor no-shows can shift timelines by days or weeks. Before cameras, those conversations relied on memory and phone records. Now, project teams can pull exact footage from the date and time in question, giving clients a clear, objective account of what happened. The result isn’t finger-pointing; it’s clarity.

“If there’s a delivery truck that didn’t arrive or a piece of equipment stuck on another jobsite, the owner can see it for themselves,” Wofford explains. “It takes the tension out of those conversations.”

Operational Benefits Beyond Client Relations

While cameras were initially deployed as a client-facing transparency tool, Dimension Construction quickly discovered internal advantages:

  • Proactive Problem Solving: Managers can spot potential issues like incorrect material placement or unsafe conditions before they escalate.
  • Portfolio Oversight: For clients managing multiple locations, the ability to check progress remotely reduces the need for in-person visits.
  • Reduced Travel: Superintendents can focus on priority sites while still keeping eyes on other active projects.

Even with live cameras in place, Dimension Construction still prioritizes in-person visits for relationship-building. “Technology doesn’t replace face-to-face interaction,” Wofford notes. “It enhances it by making sure every visit is focused and productive.”

Screenshot of security recordings in the TrueLook platform showing how Dimension Construction kept an eye on the site and was able to fetch any recordings for documentation

ROI in Trust and Reputation

For Dimension Construction, the return on investment isn’t measured solely in cost savings, but in the confidence and trust earned from clients—a competitive advantage in the Southeast’s crowded construction market.

As a small business, every purchase is carefully considered, and technology investments aren’t made on a whim. The fact that Dimension Construction has made TrueLook part of its standard toolkit speaks volumes. “For what you get with these cameras, it’s a no-brainer,” Wofford says. “And when we can fold the cost into a project budget, it becomes an easy decision, especially for the visibility and peace of mind it delivers.”

“The cameras aren’t just equipment,” Wofford adds. “They’re a promise. We’re showing clients that we have nothing to hide. We’re as committed to their project as they are.”

Looking Ahead

As technology adoption accelerates in the construction industry, Dimension Construction plans to continue leveraging TrueLook’s camera-and-platform solution as a standard part of its project toolkit. While their current use focuses on live viewing, time-lapse, and recorded playback, TrueLook’s platform continues to evolve, now offering AI-powered object detection, AI-powered PPE detection, activity trend analysis, and people forecasting to help contractors make data-driven decisions.

For Dimension Construction, the priority remains giving clients clear, accessible visibility into every jobsite. TrueLook’s integrated hardware and software have become everyday operational assets and a visible commitment to transparency and accountability.

In a business where reputation is built one project at a time, Dimension Construction proves that the right technology doesn’t just document the work; it strengthens trust and builds relationships that last well beyond project completion.

How One Camera Changed the Way MJ Harris Managed Projects Nationwide

Back to Hub
  • Case Studies

How One Camera Changed the Way MJ Harris Managed Projects Nationwide

Real-time visibility and progress documentation helped MJ Harris simplify project management across the country.

Camera view of a multi-story building under construction

Customer Details

MJ Harris Construction

Customer

6

Cameras Purchased

AL, AZ, TN, & more

Project Locations

TrueAI

Favorite Feature

$ 5,000 +

saved by reducing travel costs

Countless

hours saved by using remote live viewing

The Challenge

MJ Harris Construction struggled with inconsistent and inefficient jobsite photo documentation. Workers used different cameras and phones, making it hard to keep track of images. They even tried 360° cameras and had some outdated construction cameras, but they lacked continuous exterior monitoring that could provide real-time visibility of progress.

As a result, they couldn’t easily update owners or design partners, and it was tough to manage their jobsites, especially their geographically dispersed projects.

The TrueLook Solution

Starting with just one TrueLook Camera, the MJ Harris team quickly saw the value of live, continuous jobsite monitoring. The camera feeds were displayed on a TV in their office, allowing staff at all levels to check progress anytime, fostering greater transparency and teamwork.

It’s really allowed more transparency in our construction and more collaboration amongst different people within the office about what’s going on in all our jobs around the country.

Paul Hedgepath, Director of Virtual Construction, MJ Harris Construction

Impressed by the initial success, the COO made it standard practice to include TrueLook Cameras on every major project with exterior construction. Today, MJ Harris has six cameras constantly monitoring their projects nationwide, with plans to add even more.

The Results

The cameras have helped MJ Harris save significant time and travel costs by providing remote access to live jobsite conditions, reducing the need for in-person visits.

Leadership can now “visit” a jobsite without leaving the office. Rather than relying on secondhand updates or static photos, project executives and vice presidents can log in anytime for a full visual understanding of project progress.

“Instead of jumping on a plane, they can log in and see the site for themselves. That saves a lot of time and money.”

Paul Hedgepath, Director of Virtual Construction, MJ Harris Construction

It’s also helped MJ Harris prevent costly miscommunications. Designers and specialty consultants, located across the country, can view the project in real time, ask questions earlier, and provide feedback while there’s still time to make adjustments. That early input has helped the team avoid expensive rework caused by late-stage surprises.

Additionally, TrueLook Cameras have proven to be valuable security tools. When jobsite theft occurred, the team could review recorded footage to investigate and pinpoint how it happened. This helped them reduce material loss and avoid project delays.

MJ Harris Construction continues to rely on TrueLook’s evolving technology, including AI capabilities, to push the boundaries of jobsite monitoring and project collaboration.

Cameras aren’t really an option in 2025. It’s a necessity.

Paul Hedgepath, Director of Virtual Construction, MJ Harris Construction